SYENG
SYENG
Design rendering

Pharmaceutical (GMP)

Hanmi Pharmaceutical

HVAC maintenance and improvement works at Hanmi Pharmaceutical plants

Back to Portfolio

Project overview

Client
Hanmi Pharmaceutical
Sector
Pharmaceutical (GMP)

Works delivered

  • Rooftop exhaust fan bearing replacement, Plant 2
  • Shaft machining repair for two air handling units, Plant 1
  • Repair of fan motor B in B307 and the B01 scrubber fan, Plant 2
  • Duct modification and supplementary works
  • Bearing replacement, Plant 1
  • Chewable tablet post-weighing storage expansion and sampling room HVAC zoning change
  • HVAC equipment bearing replacement and one other work, Bio Plant 2
  • Motor replacement for direct-drive air handling units
  • Bearing and shaft replacement, AU-B05
  • Chewable tablet manufacturing room piping, GMP and sewage lines
  • Duct works, Formulation Research Center

Bird's-eye view

  • Hanmi Pharmaceutical bird's-eye view
+82-31-355-3315Quote