Projects
Projects
Every facility we have built, by client and year.
- Projects
- 798
- Clients
- 243
- Since
- 2005–2026
798 projects
| Division | Category | Year | Client | Work |
|---|---|---|---|---|
| Mechanical | Other works | 2026 | Hanwha Aerospace | Dehumidifier installation works |
| Building | Medical devices (GMP) | 2026 | Medirainaektibeukoria | Structural reinforcement works |
| Building | Medical devices (GMP) | 2026 | Medirainaektibeukoria | Rooftop waterproofing works |
| Mechanical | Pharmaceutical (GMP) | 2026 | Humedix | Plant 2 2F HVAC system change works |
| Mechanical | Pharmaceutical (GMP) | 2026 | Atotekkoria | Utility piping replacement works |
| Mechanical | Pharmaceutical (GMP) | 2026 | Atotekkoria | 120t water tank replacement and equipment fabrication and installation works |
| Building | Pharmaceutical (GMP) | 2026 | Woogene B&G | Roof panel replacement works |
| Cleanroom | Pharmaceutical (GMP) | 2026 | Celltrion | Jincheon plant quality control building cleanroom environment improvement works |
| Cleanroom | Pharmaceutical (GMP) | 2026 | Jiswelbaio | 7F cleanroom remodeling works |
| Cleanroom | Medical devices (GMP) | 2026 | Uscarepharm | 11F cleanroom remodeling works |
| Building | Pharmaceutical (GMP) | 2026 | DongKoo Bio & Pharma | Hyangnam plant exterior fence works |
| Maintenance | Pharmaceutical (GMP) | 2026 | Hanmi Fine Chemical | Summer HVAC system maintenance works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Hanmi Fine Chemical | Summer HVAC system TAB works |
| Mechanical | Other works | 2025 | Jahyehakgyo | Jahye School educational environment improvement project elevator installation works |
| Mechanical | Pharmaceutical (GMP) | 2025 | Hyuonseusaengmyeonggwahak | 2F oral solid dosage manufacturing facility expansion works |
| Mechanical | Other works | 2025 | ROK Army VII Corps | Military satellite communication system package main works |
| Mechanical | Pharmaceutical (GMP) | 2025 | HL Genomics | Spare room constant temperature and humidity unit installation works |
| Mechanical | Semiconductor (ICR/BCR) | 2025 | GMTEST | Site facility 2F epoxy works |
| Cleanroom | Medical devices (GMP) | 2025 | Cowellmedi | Plant 2 washing room cleanliness class change works |
| Cleanroom | Medical devices (GMP) | 2025 | JETEMA | Yongin plant medical devices production division manufacturing area C GMP expansion works |
| Building | Other works | 2025 | Hwaseong City Hall | Dongtan Lake Park parking tower remodeling building works |
| Cleanroom | Medical devices (GMP) | 2025 | Jenewel | Medical devices and cosmetics GMP manufacturing facility HVAC system works |
| Building | Pharmaceutical (GMP) | 2025 | DongKoo Bio & Pharma | Hyangnam plant main building 4 new construction works |
| Building | Pharmaceutical (GMP) | 2025 | DongKoo Bio & Pharma | Hyangnam plant main building 11 extension works |
| Mechanical | Pharmaceutical (GMP) | 2025 | Humedix | PFS filling line 2 HVAC system change works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Pharmgen Science | Solid dosage line cleanroom remodeling works |
| Mechanical | Food (HACCP) | 2025 | Pudeueosembeul | Busan plant remodeling works |
| Cleanroom | Medical devices (GMP) | 2025 | Uscarepharm | 9F cleanroom remodeling works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Ahngook Pharm | Production division main building 1F weighing area remodeling works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Hanmi Pharm | Chewable tablet manufacturing room piping / GMP yukga and sewage line works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Hanmi Fine Chemical | Winter HVAC system maintenance works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Hanmi Fine Chemical | Winter HVAC system TAB works |
| Cleanroom | Medical devices (GMP) | 2025 | Teseuripeuteu | GMP cleanroom HVAC system works |
| Mechanical | Pharmaceutical (GMP) | 2025 | Huons BioPharma | Building A drug substance production area ductwork improvement works |
| Maintenance | Medical devices (GMP) | 2025 | Medirainaektibeukoria | HVAC system maintenance works |
| Maintenance | Medical devices (GMP) | 2025 | Dentium | 6F cleanroom HEPA filter replacement & PAO test |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Humedix | Compressed air machine room exhaust environment improvement works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Colorcon | HVAC system maintenance works |
| Cleanroom | Cleanroom (GMP) | 2025 | Eseuepeussi | Plant 2 cooling system and HVAC system works |
| Building | Medical devices (GMP) | 2025 | Cowellmedi | Plant 2 new construction fire-stopping works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Hanmi Fine Chemical | Refrigeration system maintenance works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | DongKoo Bio & Pharma | Production building production team 1 gowning room expansion works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Ahngook Pharm | Production division main building 1F packaging area remodeling works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Woogene B&G | Injectables clean booth expansion works |
| Cleanroom | Cleanroom (GMP) | 2025 | Keienkei | GMP manufacturing area upgrade works |
| Cleanroom | Pharmaceutical (GMP) | 2025 | Huons | Quality control department local exhaust improvement works |
| Mechanical | Cleanroom (GMP) | 2025 | Osung Advanced Materials | High-temperature aging room build-out works |
| Maintenance | Pharmaceutical (GMP) | 2025 | Humedix | Plant 2 1F / 2F production work area epoxy works |
| Building | Other works | 2025 | Pyeongtaek City Hall | Tongmun sluice gate 1 drainage pump station installation works |
| Mechanical | Semiconductor (ICR/BCR) | 2025 | Atotekkoria | Production rooftop chiller (50RT) replacement works |