Every facility we have built, by client and year.

Projects
798
Clients
243
Since
2005–2026
View Recent Work
Track record
DivisionCategoryYearClientWork
MechanicalOther works2026Hanwha AerospaceDehumidifier installation works
BuildingMedical devices (GMP)2026MedirainaektibeukoriaStructural reinforcement works
BuildingMedical devices (GMP)2026MedirainaektibeukoriaRooftop waterproofing works
MechanicalPharmaceutical (GMP)2026HumedixPlant 2 2F HVAC system change works
MechanicalPharmaceutical (GMP)2026AtotekkoriaUtility piping replacement works
MechanicalPharmaceutical (GMP)2026Atotekkoria120t water tank replacement and equipment fabrication and installation works
BuildingPharmaceutical (GMP)2026Woogene B&GRoof panel replacement works
CleanroomPharmaceutical (GMP)2026CelltrionJincheon plant quality control building cleanroom environment improvement works
CleanroomPharmaceutical (GMP)2026Jiswelbaio7F cleanroom remodeling works
CleanroomMedical devices (GMP)2026Uscarepharm11F cleanroom remodeling works
BuildingPharmaceutical (GMP)2026DongKoo Bio & PharmaHyangnam plant exterior fence works
MaintenancePharmaceutical (GMP)2026Hanmi Fine ChemicalSummer HVAC system maintenance works
MaintenancePharmaceutical (GMP)2025Hanmi Fine ChemicalSummer HVAC system TAB works
MechanicalOther works2025JahyehakgyoJahye School educational environment improvement project elevator installation works
MechanicalPharmaceutical (GMP)2025Hyuonseusaengmyeonggwahak2F oral solid dosage manufacturing facility expansion works
MechanicalOther works2025ROK Army VII CorpsMilitary satellite communication system package main works
MechanicalPharmaceutical (GMP)2025HL GenomicsSpare room constant temperature and humidity unit installation works
MechanicalSemiconductor (ICR/BCR)2025GMTESTSite facility 2F epoxy works
CleanroomMedical devices (GMP)2025CowellmediPlant 2 washing room cleanliness class change works
CleanroomMedical devices (GMP)2025JETEMAYongin plant medical devices production division manufacturing area C GMP expansion works
BuildingOther works2025Hwaseong City HallDongtan Lake Park parking tower remodeling building works
CleanroomMedical devices (GMP)2025JenewelMedical devices and cosmetics GMP manufacturing facility HVAC system works
BuildingPharmaceutical (GMP)2025DongKoo Bio & PharmaHyangnam plant main building 4 new construction works
BuildingPharmaceutical (GMP)2025DongKoo Bio & PharmaHyangnam plant main building 11 extension works
MechanicalPharmaceutical (GMP)2025HumedixPFS filling line 2 HVAC system change works
CleanroomPharmaceutical (GMP)2025Pharmgen ScienceSolid dosage line cleanroom remodeling works
MechanicalFood (HACCP)2025PudeueosembeulBusan plant remodeling works
CleanroomMedical devices (GMP)2025Uscarepharm9F cleanroom remodeling works
CleanroomPharmaceutical (GMP)2025Ahngook PharmProduction division main building 1F weighing area remodeling works
CleanroomPharmaceutical (GMP)2025Hanmi PharmChewable tablet manufacturing room piping / GMP yukga and sewage line works
MaintenancePharmaceutical (GMP)2025Hanmi Fine ChemicalWinter HVAC system maintenance works
MaintenancePharmaceutical (GMP)2025Hanmi Fine ChemicalWinter HVAC system TAB works
CleanroomMedical devices (GMP)2025TeseuripeuteuGMP cleanroom HVAC system works
MechanicalPharmaceutical (GMP)2025Huons BioPharmaBuilding A drug substance production area ductwork improvement works
MaintenanceMedical devices (GMP)2025MedirainaektibeukoriaHVAC system maintenance works
MaintenanceMedical devices (GMP)2025Dentium6F cleanroom HEPA filter replacement & PAO test
CleanroomPharmaceutical (GMP)2025HumedixCompressed air machine room exhaust environment improvement works
MaintenancePharmaceutical (GMP)2025ColorconHVAC system maintenance works
CleanroomCleanroom (GMP)2025EseuepeussiPlant 2 cooling system and HVAC system works
BuildingMedical devices (GMP)2025CowellmediPlant 2 new construction fire-stopping works
MaintenancePharmaceutical (GMP)2025Hanmi Fine ChemicalRefrigeration system maintenance works
CleanroomPharmaceutical (GMP)2025DongKoo Bio & PharmaProduction building production team 1 gowning room expansion works
CleanroomPharmaceutical (GMP)2025Ahngook PharmProduction division main building 1F packaging area remodeling works
CleanroomPharmaceutical (GMP)2025Woogene B&GInjectables clean booth expansion works
CleanroomCleanroom (GMP)2025KeienkeiGMP manufacturing area upgrade works
CleanroomPharmaceutical (GMP)2025HuonsQuality control department local exhaust improvement works
MechanicalCleanroom (GMP)2025Osung Advanced MaterialsHigh-temperature aging room build-out works
MaintenancePharmaceutical (GMP)2025HumedixPlant 2 1F / 2F production work area epoxy works
BuildingOther works2025Pyeongtaek City HallTongmun sluice gate 1 drainage pump station installation works
MechanicalSemiconductor (ICR/BCR)2025AtotekkoriaProduction rooftop chiller (50RT) replacement works

Flagship projects by client are in the portfolio; BIM models open in the 3D viewer.