SYENG
SYENG

Maintenance Service

Maintenance

OverviewMaintenance

Overview

  • Pharmaceutical and food manufacturing plants
  • Chillers and air handling units

HVAC and refrigeration maintenance from the company that built it

We record equipment condition with measured data and site photos, and recommend the work each result calls for.

Pharmaceutical and food manufacturing plants require chillers and AHUs for temperature, humidity and cleanliness control. Continuous operation increases breakdown frequency, making regular maintenance necessary.

Dedicated HVAC and refrigeration service team · every member is a licensed refrigeration engineer

Maintenance SystemMaintenance system

Maintenance system

After completion we keep inspecting on a fixed cycle, and once the defect liability period ends a service contract carries the care forward.

Preventive inspection

Once a year for 3 yearsFree
  1. Jan
  2. Feb
  3. Mar
  4. Apr
  5. MayInspection before summer
  6. JunInspection before summer
  7. Jul
  8. Aug
  9. Sep
  10. OctInspection before winter
  11. NovInspection before winter
  12. Dec
  • Inspection before summer · May–Junahead of the cooling season · chiller and AHU check
  • or
  • Inspection before winter · Oct–Novahead of the heating season · chiller and AHU check

For sites we have completed, we check chillers and air handling units once a year for three years, before summer (May–June) or before winter (October–November).

Periodic inspection

Every 6 months in the defect liability periodFree
  1. construction completion
  2. six months
  3. site inspections
  4. six months
  5. site inspections

During the defect liability period after completion we visit regularly to check equipment condition and any defects.

Service contract

Monthly or every two monthsContract

After the defect liability period we inspect HVAC and refrigeration equipment, replace filters and check T.A.B and automatic controls on the contracted cycle.

Emergency service

When a breakdown occursPer call

Report it online or by phone and the person in charge will call you back with the visit schedule.

* Parts replacement or repairs found during a free inspection go ahead only after we have given you a quotation.

How We WorkOne point of contact, start to finish

One point of contact, start to finish

SAMYOUNG ENG, which designed and built the equipment, manages everything from your request to the final report through one point of contact. Specialist HVAC and refrigeration technicians carry out the site work with precision instruments, and SAMYOUNG ENG reviews the results and advises on any follow-up.

  1. 01SAMYOUNG ENG

    Request and inspection plan

    We review the equipment history and set the inspection scope and schedule.

  2. 02Specialist technicians

    On-site inspection and servicing

    After measurement and diagnosis they carry out the servicing needed: cleaning, replacement, refrigerant recovery.

  3. 03SAMYOUNG ENG

    Review and follow-up

    We review and deliver the report, and recommend improvements or replacements where needed.

ProcessStandard inspection process

Standard inspection process

  1. 01Request and inspection plan
  2. 02Digital measurement data
  3. 03Leak, thermal and electrical diagnosis
  4. 04Servicing, cleaning and refrigerant recovery
  5. 05Test run and report delivery

Inspection ItemsSix key inspection items

Six key inspection items

Measurement and diagnosis find the early signs you cannot see by eye.

  • Data-based test run
    01

    Data-based test run

    A digital manifold gauge measures evaporating and condensing pressure, superheat and subcooling to confirm the refrigerant charge and operating condition.

  • Precision refrigerant leak check
    02

    Precision refrigerant leak check

    A high-sensitivity leak detector with a PPM readout and an ultrasonic detector track down small leaks a soap test would miss.

  • Thermal imaging
    03

    Thermal imaging

    Thermal imaging of panel contacts, terminal blocks, compressors and motors finds local hot spots before they fail.

  • Electrical circuit check
    04

    Electrical circuit check

    An insulation tester and a clamp meter measure motor winding insulation and three-phase current imbalance to reduce the risk of compressor burnout.

  • Condenser fin cleaning
    05

    Condenser fin cleaning

    A dedicated coil cleaner and pressure-washing equipment remove dirt between the fins to help restore heat-exchange performance.

  • Filter replacement and airflow check
    06

    Filter replacement and airflow check

    We check the pressure differential, replace HEPA and pre-filters, and measure and adjust airflow (T.A.B) where needed.

* Photos are illustrative examples of maintenance work.

ComparisonHow our inspection compares

How our inspection compares

ReportResults recorded in numbers and photos

Results recorded in numbers and photos

After each inspection you receive an electronic report (PDF) with measurements, verdicts, site photos, the work done and SAMYOUNG ENG's review. The history kept for each unit informs the next inspection and replacement timing.

  • Operating and electrical measurements with a verdict (normal / watch / action)
  • Leak and thermal-imaging results with site photos
  • Work done (cleaning, parts replaced, refrigerant recovered or added)
  • SAMYOUNG ENG review and recommendations
View sample report (PDF)

The report records inspection and servicing results; it does not replace certification or conformity assessment.

EquipmentEquipment we bring on site

Equipment we bring on site

We bring precision measuring and servicing equipment matched to each inspection item. The equipment may vary with site conditions.

A service vehicle that fixes it on site

A service vehicle that fixes it on site

A service vehicle carrying measuring instruments, recovery and vacuum equipment and key parts handles diagnosis, servicing and the test run on site.

  • Measurement and diagnosis
  • Leak detection
  • Recovery and vacuum
  • Cleaning and installation tools

* Photos are illustrative examples of the equipment and vehicle.

Maintenance PlanService contract plans

Service contract plans

Visit frequency and inspection items are set to your equipment and operating conditions. We confirm the details and cost after a site visit.

  • Basic

    Quarterly visit

    • Basic HVAC and refrigeration check
    • Filter replacement
    • Short inspection report
  • Standard

    Visit every two months

    • Everything in Basic
    • Measurement-based test run
    • Precision refrigerant leak check
    • Thermal and electrical diagnosis once a year, fin cleaning once a year
    • Electronic report with review, priority emergency response
  • Premium

    Monthly visit

    • Everything in Standard
    • Thermal and electrical diagnosis every visit
    • Fin cleaning twice a year, T.A.B and pressure-differential check once a year
    • Annual equipment management report
    • Emergency response time agreed separately
Request a service contract consultation

Service ContractsContracted customers and schedules

Service contracts

  • CustomerCompany A
    VisitsMonthly
    Scope
    • HVAC inspection and repair
    • AHU/HFU filter replacement and TAB
    • control system training
  • CustomerCompany B
    VisitsMonthlyTAB every 6 months
    Scope
    • AHU/chiller inspection
    • airflow measurement and pressure balancing
  • CustomerCompany C
    VisitsMonthly
    Scope
    • Cooling plant (towers, heat exchangers, pumps) inspection
  • CustomerCompany D
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
    • controls inspection
  • CustomerCompany E
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
    • controls inspection
  • CustomerCompany F
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
View as table
Service contracts
CustomerScopeVisits
Company AHVAC inspection and repair, AHU/HFU filter replacement and TAB, control system trainingMonthly
Company BAHU/chiller inspection, airflow measurement and pressure balancingMonthly; TAB every 6 months
Company CCooling plant (towers, heat exchangers, pumps) inspectionMonthly
Company DHVAC and refrigeration inspection, controls inspectionEvery 2 months
Company EHVAC and refrigeration inspection, controls inspectionEvery 2 months
Company FHVAC and refrigeration inspectionEvery 2 months

All contracted after the defect liability period ended

Equipment inventoryEquipment inventory

Equipment inventory

Airflow, cleanliness and environment measurement

  • Anemometer 8386A/TSI
    Anemometer8386A/TSI

    Measurement / use
    Airflow and velocity measurement

  • Temperature recorder DX2020
    Temperature recorderDX2020

    Measurement / use
    Temperature recording

  • Airflow meter ALNOR6465
    Airflow meterALNOR6465

    Measurement / use
    Airflow measurement

  • Particle counter 237B
    Particle counter237B

    Measurement / use
    Airborne particle measurement

  • Digital thermo-hygrometer TESTO 635
    Digital thermo-hygrometerTESTO 635

    Measurement / use
    Temperature and humidity measurement

  • Sound level meter TESTO 815
    Sound level meterTESTO 815

    Measurement / use
    Noise measurement

  • Illuminance meter TESTO 545
    Illuminance meterTESTO 545

    Measurement / use
    Illuminance measurement

Electrical, flow and performance testing

  • Dielectric withstand tester ILO-PT2004
    Dielectric withstand testerILO-PT2004

    Measurement / use
    Dielectric withstand measurement

  • Electronic flowmeter KTM-800
    Electronic flowmeterKTM-800

    Measurement / use
    Pipe flow measurement

  • CLAMP METER HIOKI 3280-10
    CLAMP METERHIOKI 3280-10

    Measurement / use
    Current and voltage measurement

  • Heat-pump performance tester 50VP
    Heat-pump performance tester50VP

    Measurement / use
    Heat-pump and chiller performance testing

Precision dimension measurement

  • Pitch gauge
    Pitch gauge

    Measurement / use
    Thread pitch measurement

  • Vernier callipers 300mm
    Vernier callipers300mm

    Measurement / use
    Precision dimension measurement

Fabrication and welding

  • Copper pipe bender 15A-40A
    Copper pipe bender15A-40A

    Measurement / use
    PZPE bending

  • Electric welder 3KW
    Electric welder3KW

    Measurement / use
    General welding

  • Oxygen welderQuantity 3
    Oxygen welder

    Measurement / use
    General welding

View as table
Equipment → Measurement
NOEquipmentSpecificationQuantityMeasurement / use
1Pitch gauge-1Thread pitch measurement
2Vernier callipers300mm1Precision dimension measurement
3Anemometer8386A/TSI1Airflow and velocity measurement
4Dielectric withstand testerILO-PT20041Dielectric withstand measurement
5Electronic flowmeterKTM-8001Pipe flow measurement
6Temperature recorderDX20201Temperature recording
7Airflow meterALNOR64651Airflow measurement
8Particle counter237B1Airborne particle measurement
9Digital thermo-hygrometerTESTO 6351Temperature and humidity measurement
10Sound level meterTESTO 8151Noise measurement
11Illuminance meterTESTO 5451Illuminance measurement
12CLAMP METERHIOKI 3280-101Current and voltage measurement
13Heat-pump performance tester50VP1Heat-pump and chiller performance testing
14Copper pipe bender15A-40A1PZPE bending
15Electric welder3KW1General welding
16Oxygen welder-3General welding

FAQFrequently asked questions

Frequently asked questions

Do you inspect equipment SAMYOUNG ENG did not install?

Yes. After a site visit we explain the inspection scope and method.

Is the preventive inspection free?

Yes. For sites we have completed, we provide a free preventive inspection once a year for three years, before summer or winter. Parts replacement or repairs found during the inspection go ahead only after we have given you a quotation.

How do I receive the results?

As an electronic report (PDF) with measurements and photos.

How soon do you respond after a breakdown report?

After your report the person in charge calls you with the visit schedule.

How is refrigerant handled during servicing?

It is recovered with recovery equipment into dedicated cylinders, and the amount is recorded in the report.

Maintenance is carried out under SAMYOUNG ENG's management together with specialist partner technicians; equipment and inspection items may vary with site conditions. Inspection reports record inspection and servicing results and do not replace certification or conformity assessment.

Repair & Service

Something wrong with your equipment?

Leave the equipment name, site location and symptoms, and the person in charge will contact you.

+82-31-355-3315Quote