SYENG
SYENG

Portfolio

Portfolio

Flagship projects from our company profile, by client.

PortfolioFlagship projects by client

Portfolio

  1. Yuhan Chemical bird's-eye view
    01

    Yuhan Chemical

    • GMP HVAC equipment works, Bldg HB BAY-2, Hwaseong Plant
    • Cleanroom remodeling works, Bldg G BAY-2, Ansan Plant
    • Remodeling works, Bldg E, Hwaseong Plant
    • GMP HVAC equipment works, Bldg HA, Hwaseong Plant
    • GMP equipment works for low-temperature indoor hazardous materials storage
    • Refrigeration equipment works for low-temperature hazardous materials storage, Ansan Plant
    • Structural reinforcement and HVAC works for the pilot room, Bldg HA, Hwaseong Plant
    • Cleanroom renovation and repair works, Bldgs A-1 and B, Ansan Plant
    • GMP architectural, HVAC and refrigeration works, Production Bldg E, Ansan Plant
    • GMP HVAC equipment works, new building, Hwaseong Plant
    • Cleanroom relocation and installation works, logistics building, Ansan Plant
    • HVAC equipment works, Production Bldg B
  2. Hanmi Pharmaceutical bird's-eye view
    02

    Hanmi Pharmaceutical

    • Rooftop exhaust fan bearing replacement, Plant 2
    • Shaft machining repair for two air handling units, Plant 1
    • Repair of fan motor B in B307 and the B01 scrubber fan, Plant 2
    • Duct modification and supplementary works
    • Bearing replacement, Plant 1
    • Chewable tablet post-weighing storage expansion and sampling room HVAC zoning change
    • HVAC equipment bearing replacement and one other work, Bio Plant 2
    • Motor replacement for direct-drive air handling units
    • Bearing and shaft replacement, AU-B05
    • Chewable tablet manufacturing room piping, GMP and sewage lines
    • Duct works, Formulation Research Center
  3. Celltrion bird's-eye view
    03

    Celltrion

    • Cleanroom remodeling works, BL-2 lab
    • Facility installation works, BL-2 lab
    • BL-2 GMP equipment works
    • Supply and exhaust duct installation works
  4. Huons bird's-eye view
    04

    Huons

    • HVAC equipment remodeling works, Bldg A, Huons Biopharma
    • Local exhaust improvement works, Quality Control Dept.
    • GMP remodeling works, production building
    • Cleanroom relocation and installation works, printing room
    • GMP construction of diagnostic kit production line, Huons Medicare
    • HVAC equipment works, Gwacheon Knowledge Information Town 1-A-2
    • GMP HVAC equipment works, Cartridge Line 2
    • Extension and remodeling works, Huons Foodience Chuncheon Plant
    • Research facility environment improvement works, Huons Global Seongnam Plant
    • HVAC equipment works for sampling room and tableting room
    • Environment improvement works, instrumental analysis lab
    • Major repair works, Huons Foodience Geumsan Plant
  5. Daewoong Bio bird's-eye view
    05

    Daewoong Bio

    • HVAC equipment works, Plant 1
    • Design of GMP equipment works for new Plant 3
    • Stability room equipment works
  6. Dongkoo Bio & Pharma bird's-eye view
    06

    Dongkoo Bio & Pharma

    • GMP extension and remodeling works, Bldg Ju-1
    • GMP extension works, Bldg Ju-9
    • GMP extension works, Bldg Ju-10
    • Gowning room expansion works, Production Team 1, production building
    • Cleanroom remodeling works, new counting line
    • Exterior wall crack and leak repair works
    • Environment improvement works, bin blender
    • Wastewater piping repair works, Pangyo Research Center
    • Structural reinforcement and 4th-floor extension works, Bldg 4
    • New outdoor parking lot works
    • Remodeling works, Bldg 4 3F
    • Cleanroom layout change works, production building
  7. Pharmgen Science bird's-eye view
    07

    Pharmgen Science

    • Cleanroom remodeling works, solid dosage area
    • Repair works, air handling unit No. 7
    • Cleanroom environment improvement works, automatic sorting room
    • Cleanroom layout change works, tableting room
    • Cleanroom layout change works, weighing room
    • Cleanroom layout change works, coating room
    • Cleanroom layout change works, automatic sorting room
  8. Ahn-Gook Pharmaceutical bird's-eye view
    08

    Ahn-Gook Pharmaceutical

    • Cleanroom remodeling works, 1F weighing area, main building, Production HQ
    • Cleanroom remodeling works, 1F packaging area, main building, Production HQ
    • Cleanroom remodeling works, semi-finished goods storage
    • Cleanroom remodeling works, new bottle packaging line
    • Cleanroom remodeling works, QC central laboratory
    • Cleanroom and HVAC equipment improvement works, finished goods storage
    • Anteroom installation works for logistics and personnel flow, leased warehouse
    • Air pollution prevention facility improvement works
    • Cleanroom improvement works, semi-finished goods storage
    • New GMP HVAC equipment works
    • Cleanroom equipment works
    • GMP layout change works
  9. Humedix bird's-eye view
    09

    Humedix

    • Exhaust environment improvement works, compressed air machine room
    • Integrated layout change works, 4F QC office
    • Cleanroom HVAC equipment works, weighing room, Plant 2 2F
    • Cleanroom remodeling and HVAC equipment works, PFS preparation room, Plant 2 1F
    • Cleanroom change works, PFS work area, Plant 2
    • GMP HVAC equipment works within PSM supplementary works, Plant 1
    • Cleanroom change works, PFS work area, Plant 2
    • Turbo chiller fabrication and installation works, Plant 2
    • GMP HVAC equipment works, new vial line
    • GMP HVAC equipment works, vaccine work area
    • Extension works, QC laboratory, Plant 2 4F
    • HVAC equipment works, finished product Production Team 1
  10. Korea Prime Pharm bird's-eye view
    10

    Korea Prime Pharm

    • New GMP construction works, Medix Pharm
    • Air handling unit and HVAC equipment works, Plant 1
  11. Dong-A Pharmaceutical bird's-eye view
    11

    Dong-A Pharmaceutical

    • Supplementary works, drying room, Production Team 2
    • GMP HVAC equipment works, Production Team 1
    • CKD-868 Project: cold storage and drying room works, Production Team 2
    • GMP HVAC equipment works, clean room
    • HVAC system equipment works
    • New dispensing work area, Synthesis Bldg 2
    • Dehumidifier fabrication and installation works, DSC drying and packaging room, Banwol Plant
  12. ST Pharm bird's-eye view
    12

    ST Pharm

    • Air supply and exhaust facility works, Sihwa Plant
    • HVAC equipment works for laboratory rearrangement, Banwol Plant
    • HVAC equipment works for laboratory relocation, Banwol Plant
    • Dehumidifier installation works, Banwol Plant
  13. Shin Il Pharmaceutical bird's-eye view
    13

    Shin Il Pharmaceutical

    • GMP works for dry, cool and dark storage / finished goods warehouse
    • HVAC equipment works, plaster building
    • Weighing booth improvement works, weighing room, main building
    • Exhaust noise reduction works, machine room
    • Semi-finished goods warehouse improvement and GMP duct works
    • Clean booth change and installation works, main building
    • HVAC equipment works within warehouse and guardhouse extension
    • Cleanroom remodeling works, weighing room
    • Constant temperature and humidity unit fabrication and installation works
    • GMP remodeling HVAC equipment works
    • HVAC equipment remodeling works
    • GMP HVAC equipment works
  14. Alvogen Korea bird's-eye view
    14

    Alvogen Korea

    • New cleanroom works for weighing and sampling rooms, Hyangnam Plant
    • Weighing room expansion works, Hyangnam Plant
    • Equipment works for incoming holding area and raw material storage, Hyangnam Plant
    • Semi-finished goods storage remodeling works, Gongju Plant
    • Humidification line works, Hyangnam Plant
    • Washing room improvement works, Hyangnam Plant
    • Cleanroom remodeling works, Hyangnam Plant
    • Cleanroom remodeling works, Gongju Plant
    • Air handling unit installation and duct works, Hyangnam Plant
    • GMP remodeling works, Metilon manufacturing facility, Gongju Plant
    • Air handling unit installation works, finished goods storage, Gongju Plant
  15. Medica Korea bird's-eye view
    15

    Medica Korea

    • Hazardous materials storage extension works
    • Cleanroom remodeling works, tablet printing room 2, solid dosage team
    • Cleanroom remodeling works, vacuum dryer machine room
    • Cleanroom remodeling works, production department
    • Remodeling works, formulation lab and packaging team
    • Cleanroom remodeling works, production area
    • Cleanroom remodeling works, 2F pillow line
  16. Hwail Pharmaceutical bird's-eye view
    16

    Hwail Pharmaceutical

    • Fire damage recovery HVAC and architectural works
    • CDU fabrication and installation works, Hagil-ri Plant
    • GMP HVAC equipment remodeling works
    • GMP extension works
  17. Taeguk Pharm bird's-eye view
    17

    Taeguk Pharm

    • GMP remodeling HVAC equipment works
    • Cleanroom remodeling works
    • Air handling unit replacement and zoning change works, Hyangnam Plant
    • Environmental safety improvement works, oral solid dosage Zone 1
    • Flame-retardant panel replacement and GMP remodeling works, spare building
    • Remodeling works, Quality Dept. 2F
    • Remodeling works, Quality Dept. 3F
    • New waste storage building works
    • Accessibility facility improvement works
    • Waste solvent tank installation works
  18. INIST ST bird's-eye view
    18

    INIST ST

    • GMP works, raw material synthesis building, Osong Plant
  19. Merck bird's-eye view
    19

    Merck

    • NF3 abatement project HVAC works, Ulsan Plant
    • HVAC equipment works, ION-X, Banwol Plant
  20. Atotech Korea bird's-eye view
    20

    Atotech Korea

    • 50RT chiller replacement works, production rooftop
    • Cleanroom environment improvement works, QC Lab-1
    • Cleanroom environment improvement and remodeling works
    • Grating reinforcement works, Sump #3 and #4, production building 1F
    • Cleanroom repair works
    • QC Lab GMP expansion works
    • Office remodeling works, 3F
    • Environment improvement works, TC Lab
    • Environment improvement works, MS Lab
    • New constant temperature warehouse works
    • 1-ton vessel tank fabrication and installation works
    • TOC booth fabrication and installation works
  21. Cowelmedi bird's-eye view
    21

    Cowelmedi

    • Fireproof filling works, new Plant 2
    • GMP cleanroom works, new Plant 2
    • GMP HVAC equipment works, new Plant 2
  22. Kumho Electric bird's-eye view
    22

    Kumho Electric

    • Cleanroom equipment works, coating room, Lines 17 and 18
    • HVAC equipment works, Lines 16 and 17
    • HVAC system works, coating room, Lines 5-8
    • Coating room equipment works
    • Constant temperature system works, coating room, Lines 11-17
    • Cleanroom equipment works, main building
    • Exhaust environment improvement works, reliability test lab
    • Automatic soldering equipment works
    • Chilled water piping works, main building
    • Cleanroom equipment works, research building
    • Constant temperature and humidity equipment works, cleanroom
    • FCU HVAC system works, Lines 1-8
  23. Sungyi Bio bird's-eye view
    23

    Sungyi Bio

    • GMP HVAC equipment works, new building
    • Cleanroom remodeling works, 3F manufacturing facility
    • Cleanroom remodeling works, 2F
    • Layout change and HVAC equipment works, 3F manufacturing facility
    • Cleanroom equipment works
    • GMP layout change works
  24. Dentium bird's-eye view
    24

    Dentium

    • Cleanroom GMP equipment works, new Gwanggyo headquarters
    • New cleanroom GMP construction works, Yongin Plant
    • Environment works for gowning room and subsidiary materials washing room, HQ 6F cleanroom
    • Cleanroom expansion works, HQ 6F
    • Cleanroom remodeling works, HQ 6F
    • Cleanroom relocation works, HQ 11F

Contact Us

Your next project starts here.

Talk to us about the right engineering approach for your facility, scale and schedule.

+82-31-355-3315Quote