Cleanroom equipment filters the air entering a clean area, keeps dust from coming in with people and materials, and holds room pressure, temperature and humidity. SAMYOUNG ENG registered its air-handling equipment factory in 2006 and has carried out cleanroom equipment work from air shower and pass box supply to clean booth fabrication and installation and HEPA filter replacement.

Scope of WorkWhat we deliver

Scope of work

  • Air Shower
    01

    Air Shower

    Removes dust from people or items with high-speed clean air before entry

  • Pass Box
    02

    Pass Box

    Installed in a cleanroom wall to transfer small items into the room

  • Clean Booth
    03

    Clean Booth

    Creates a local clean space using air supplied through a fan filter unit

  • Fan Filter Unit
    04

    Fan Filter Unit

    A unit with a fan and filter that filters air

Cleanroom componentsCleanroom components

Cleanroom components

A cleanroom controls airborne particle concentrations and minimises dust generation, entry and retention.

Environmental conditions such as temperature, humidity, airflow and pressure are maintained to meet requirements.

Cleanroom equipment

Isometric cutaway of a GMP cleanroom with air handling unit, condensing unit, ceiling filters, clean booth, pass box, air shower and clean locker

What each component does

  1. 01Fan Filter Unit

    A unit with a fan and filter that filters air

  2. 02HEPA Filter Unit

    A unit with a filter that filters air

  3. 03Clean Booth

    Creates a local clean space using air supplied through a fan filter unit

  4. 04Pass Box

    Installed in a cleanroom wall to transfer small items into the room

  5. 05Air Shower

    Removes dust from people or items with high-speed clean air before entry

  6. 06Relief Damper

    Maintains cleanroom differential pressure

  7. 07Condensing Unit

    A condensing assembly with a built-in condenser and compressor

  8. 08Air Handling Unit

    Draws in air and provides air purification, cooling, dehumidification, heating and humidification

  9. 09Clean Locker

    Stores used cleanroom clothing, removes dust from its exterior and prevents dust adhesion

View as table
Cleanroom equipment
ComponentFunction
Fan Filter UnitA unit with a fan and filter that filters air
HEPA Filter UnitA unit with a filter that filters air
Clean BoothCreates a local clean space using air supplied through a fan filter unit
Pass BoxInstalled in a cleanroom wall to transfer small items into the room
Air ShowerRemoves dust from people or items with high-speed clean air before entry
Relief DamperMaintains cleanroom differential pressure
Condensing UnitA condensing assembly with a built-in condenser and compressor
Air Handling UnitDraws in air and provides air purification, cooling, dehumidification, heating and humidification
Clean LockerStores used cleanroom clothing, removes dust from its exterior and prevents dust adhesion

Choosing cleanroom equipmentChoosing cleanroom equipment

Choosing cleanroom equipment

When to use each cleanroom device and what to check when choosing it. Performance figures for each device, such as nozzle velocity and filter efficiency, come from the manufacturer's specifications.

Choosing cleanroom equipment

  • Air Shower
    Use it when

    Operators need to remove dust from their bodies and clothing before entering the clean area after gowning

    Check when choosing
    • Separate personnel and material entries where possible (gowning room and air shower for people, pass box for materials).
    • Both doors must not open at the same time: interlocks for airlocks leading to Grades A and B of a sterile-medicines facility, at least a visual and/or audible warning for airlocks leading to Grades C and D.
    • In sterile-medicines facilities, the final stage of an airlock must match, at rest, the grade of the room it leads to.
  • Pass Box
    Use it when

    Small items have to pass through the wall into the clean area without a person entering

    Check when choosing
    • Decide whether the box must be flushed with filtered air to protect the higher-grade side.
    • The doors must not open at the same time (whether to use an interlock is a design choice).
    • Only items on an approved list, validated for the transfer process, go into Grades A and B.
  • Clean Booth
    Use it when

    Only a specific work zone or bench, not the whole room, needs to be made locally clean with filtered air

    Check when choosing
    • Decide the required cleanliness and airflow pattern first (unidirectional airflow for Grade A sterile manufacture: 0.36–0.54m/s at the working position, guidance value).
    • The installation must allow filter integrity testing and airflow volume measurement (requalification items).
  • Panels
    Use it when

    Walls, ceilings and partitions divide the clean area and keep out external contamination

    Check when choosing
    • Choose the panel material and thickness for the cleanliness grade and process of the space.
    • Seal panel joints and moulding connections, for example with silicone, to keep the enclosure airtight.
View as table
Choosing cleanroom equipment
DeviceUse it whenCheck when choosing
Air ShowerOperators need to remove dust from their bodies and clothing before entering the clean area after gowningSeparate personnel and material entries where possible (gowning room and air shower for people, pass box for materials). Both doors must not open at the same time: interlocks for airlocks leading to Grades A and B of a sterile-medicines facility, at least a visual and/or audible warning for airlocks leading to Grades C and D. In sterile-medicines facilities, the final stage of an airlock must match, at rest, the grade of the room it leads to.
Pass BoxSmall items have to pass through the wall into the clean area without a person enteringDecide whether the box must be flushed with filtered air to protect the higher-grade side. The doors must not open at the same time (whether to use an interlock is a design choice). Only items on an approved list, validated for the transfer process, go into Grades A and B.
Clean BoothOnly a specific work zone or bench, not the whole room, needs to be made locally clean with filtered airDecide the required cleanliness and airflow pattern first (unidirectional airflow for Grade A sterile manufacture: 0.36–0.54m/s at the working position, guidance value). The installation must allow filter integrity testing and airflow volume measurement (requalification items).
PanelsWalls, ceilings and partitions divide the clean area and keep out external contaminationChoose the panel material and thickness for the cleanliness grade and process of the space. Seal panel joints and moulding connections, for example with silicone, to keep the enclosure airtight.
  • Basis: EU GMP Annex 1 (2022) sections 4.10, 4.12, 4.13, 4.30 and 4.32; MFDS GMP regulation Annex 1, section 4. Interlock, pressure and airflow requirements are sterile-medicines rules; other facilities set them by process risk.
  • Track record (2025 company profile): air shower and pass box supply (2006), panel and air shower installation (2006), injectables clean booth expansion (2025), clean booth installation (2014) and cleanroom panel installation (2020), among others.

Equipment projectsEquipment projects

Equipment projects

SAMYOUNG ENG registered its air-handling equipment factory in 2006 and has carried out cleanroom equipment work from air shower and pass box supply to clean booth fabrication and installation and HEPA filter replacement.

Projects from the 2025 company profile track record in which we supplied, fabricated, installed or replaced cleanroom equipment.

View as table
Cleanroom equipment projects
YearProject
2025Injectables clean booth expansion
20256th-floor cleanroom HEPA filter replacement and PAO test
2024Weighing booth upgrade in the main building weighing room
2022Clean booth relocation and installation
2021TOC booth fabrication and installation
2020Cleanroom equipment installation in an inorganic analysis laboratory
2019Clean booth for the inorganic analysis laboratory of the National Environmental Specimen Bank
2017Clean booth fabrication and installation
2014Clean booth installation at the Ansan plant
2013Clean booth installation in production building G at the Ansan plant
2012Clean booth installation in the aseptic building at the Ansan plant
2010Cleanroom equipment installation
2009Cleanroom equipment fabrication and installation for an injection-moulding room
2007Clean booth and dust collector installation in the Ansan plant ampicillin store
2006Air shower and pass box supply
2006Panel and air shower installation
  • Source: 2025 company profile track record. Performance figures for each device come from the manufacturer's specifications.

16 related projects (cumulative)

  • 덴티움
  • 우진비앤지
  • 신일제약
  • 아토텍코리아
  • 국립환경과학원

Other business areas

Contact Us

Your next project starts here.

Talk to us about the right engineering approach for your facility, scale and schedule.