
Projects
Projects
Every facility we have built, by client and year.
- Projects
- 798
- Clients
- 243
- Since
- 2005–2026
HACCP hygiene environments and cold-storage works for food manufacturing facilities.
48 projectsClear filters
| Division | Category | Year | Client | Work |
|---|---|---|---|---|
| Mechanical | Food (HACCP) | 2025 | Pudeueosembeul | Busan plant remodeling works |
| Cleanroom | Food (HACCP) | 2023 | Keieichiaenbi | Food line cleanroom remodeling works |
| Cleanroom | Food (HACCP) | 2023 | Taeyeongsikpum | New construction (2F, 3F) structural reinforcement and layout change works |
| Cleanroom | Food (HACCP) | 2023 | Taeyeongsikpum | Powder room panel and supply and exhaust HVAC system works |
| Cleanroom | Food (HACCP) | 2023 | Taeyeongsikpum | New construction (2F, 3F) structural reinforcement and layout change works |
| Cleanroom | Food (HACCP) | 2023 | Taeyeongsikpum | New building powder room HVAC system works |
| Building | Food (HACCP) | 2022 | Maniker F&G | Information systems department server room relocation and computer room build-out works |
| Maintenance | Food (HACCP) | 2022 | Yesanchuksaneophyeopdongjohap | HVAC system maintenance works |
| Building | Food (HACCP) | 2021 | Maniker F&G | Freezing and refrigeration warehouse and plant for subdivision operations major repair works |
| Cleanroom | Food (HACCP) | 2019 | Kojoobu | Low-temperature warehouse new construction works |
| Cleanroom | Food (HACCP) | 2018 | Kojoobu | Freezing and refrigeration aseptic room HVAC system works |
| Maintenance | Food (HACCP) | 2018 | Kojoobu | Refrigeration system maintenance works |
| Mechanical | Food (HACCP) | 2018 | Kojoobu | Jerky building cold storage warehouse CDU20HP replacement works |
| Cleanroom | Food (HACCP) | 2018 | Taeyeongsikpum | HACCP HVAC system works |
| Mechanical | Food (HACCP) | 2018 | Asanchukhyeop | Compressor replacement works |
| Cleanroom | Food (HACCP) | 2017 | Hangjinchuksan | Hangjin Livestock HACCP system works |
| Mechanical | Food (HACCP) | 2017 | Eksohureswi | Ilsan center refrigeration unit No. 8 high-efficiency chiller replacement works |
| Cleanroom | Food (HACCP) | 2017 | Kojoobu | Freezing and refrigeration aseptic room HACCP HVAC system works |
| Mechanical | Food (HACCP) | 2016 | Seoulyeongdongnonghyeop | Hanwoo Plaza mechanical system new installation works |
| Mechanical | Food (HACCP) | 2016 | Bolak | Chiller installation works |
| Maintenance | Food (HACCP) | 2016 | Naknongchuksaneophyeopdongjohap | Cheonan and Gongju HVAC system maintenance works |
| Mechanical | Food (HACCP) | 2015 | Sam Yeon Mool San | Dangjin dairy water tank replacement works |
| Mechanical | Food (HACCP) | 2015 | Sam Yeon Mool San | Milk collection station chiller installation works |
| Mechanical | Food (HACCP) | 2014 | Bolak | Chiller installation works |
| Cleanroom | Food (HACCP) | 2014 | Sangwadeulepeuaenssi | Sangwadeul F&C Cheongwon plant HACCP remodeling works |
| Mechanical | Food (HACCP) | 2014 | Sam Yeon Mool San | Air-cooled split chiller installation works |
| Mechanical | Food (HACCP) | 2014 | Sangwadeulepeuaenssi | Sangwadeul F&C Cheongwon plant floor epoxy works |
| Mechanical | Food (HACCP) | 2014 | Bolak | Chiller installation works |
| Mechanical | Food (HACCP) | 2014 | Autel | Air-cooled chiller installation works |
| Cleanroom | Food (HACCP) | 2014 | Sangwadeulepeuaenssi | Sangwadeul F&C Cheongwon plant cold storage warehouse new construction works |
| Mechanical | Food (HACCP) | 2014 | Sangwadeulepeuaenssi | Chiller installation works |
| Cleanroom | Food (HACCP) | 2013 | Hanseonggieop | Gimhae plant HVAC and refrigeration system works |
| Cleanroom | Food (HACCP) | 2012 | CHC Food | Bee Cheng Hiang manufacturing plant HACCP new construction works |
| Mechanical | Food (HACCP) | 2012 | CHC Food | Bee Cheng Hiang manufacturing plant piping system works |
| Mechanical | Food (HACCP) | 2012 | Aseubi | Yamane chiller supply and installation works |
| Mechanical | Food (HACCP) | 2012 | Hureswiotu | Taebaek plant refrigeration, freezing and HVAC system new construction works |
| Mechanical | Food (HACCP) | 2012 | CHC Food | Bee Cheng Hiang manufacturing plant air supply system works |
| Cleanroom | Food (HACCP) | 2011 | Gaeseonginsamgongsa | GMP facility remodeling works |
| Mechanical | Food (HACCP) | 2011 | Sam Yeon Mool San | Chiller fabrication and installation works |
| Cleanroom | Food (HACCP) | 2010 | Bolak | Raw herb manufacturing area cleanroom system works |
| Mechanical | Food (HACCP) | 2010 | Maeil Dairies | Constant temperature and humidity unit installation works |
| Cleanroom | Food (HACCP) | 2008 | Gaeseonginsamgongsa | GMP processing plant HVAC system works |
| Cleanroom | Food (HACCP) | 2008 | Dongseongmulsan | Production line cleanroom system works |
| Mechanical | Food (HACCP) | 2008 | CJ CheilJedang | Tofu raw food coagulator, steam-go and hot air blower installation works |
| Mechanical | Food (HACCP) | 2008 | CJ CheilJedang | Tofu line extension and utility installation works |
| Cleanroom | Food (HACCP) | 2007 | Konpeurodeokcheukoria | Can packaging room cleanroom installation works |
| Cleanroom | Food (HACCP) | 2007 | Dowul Foods | Eco-friendly agricultural and fishery products processing facility HACCP new construction works |
| Mechanical | Food (HACCP) | 2006 | Samposikpum | 225HP tunnel freezer fabrication and system works |