Site Survey · URS Review
We survey the site and facility conditions and capture the user requirement specification (URS) that sets the design basis.
- Site survey findings
- User requirement specification (URS)

Stages & Deliverables
From site survey and requirements review through design and construction to TAB, commissioning and qualification, documentation handover and maintenance, we run a single process. Every stage leaves the deliverables the next stage builds on.
We survey the site and facility conditions and capture the user requirement specification (URS) that sets the design basis.
We turn the agreed requirements into drawings and specifications and integrate the HVAC, piping and electrical design.
Specialist trades build the architecture and building services while we manage quality and safety.
We test and balance airflow and pressure differentials and commission the systems under real operating conditions.
We support the documented verification of installation and operational qualification (IQ, OQ) and TAB.
We compile and hand over the as-built drawings and operating documentation.
After completion, scheduled inspection and maintenance keep the facility performing.
Other business areas
Contact Us
Talk to us about the right engineering approach for your facility, scale and schedule.