SYENG
SYENG

Maintenance

Maintenance Service

OverviewMaintenance Service

Overview

  • Pharmaceutical and food manufacturing plants
  • Chillers and air handling units

Pharmaceutical and food manufacturing plants require chillers and AHUs for temperature, humidity and cleanliness control. Continuous operation increases breakdown frequency, making regular maintenance necessary.

Maintenance systemMaintenance system

Maintenance system

A chiller or AHU stoppage can affect production and finished/semi-finished product storage, increasing losses.

We therefore conduct annual preventive and periodic inspections and ongoing maintenance to minimise customer losses caused by facility breakdowns.

Before it breaks, we are there first.

Dedicated HVAC and refrigeration service team · every member is a licensed refrigeration engineer

Preventive inspections

once a yearFree
  1. Jan
  2. Feb
  3. Mar
  4. Apr
  5. May
  6. Jun
  7. Jul
  8. Aug
  9. Sep
  10. Oct
  11. Nov
  12. Dec
  • before summer
  • or before winter
  • pre-summer / pre-winter preventive inspection

One free preventive inspection once a year before summer or before winter (usually before summer), regardless of the defect-liability period.

Periodic inspections

once every six monthsduring the defect liability period
  1. construction completion
  2. six months
  3. site inspections
  4. six months
  5. site inspections

Regular site inspections once every six months during the defect liability period after construction completion

View as table
Maintenance system
InspectionDetails
Preventive inspectionsOne free preventive inspection once a year before summer or before winter (usually before summer), regardless of the defect-liability period.
Periodic inspectionsRegular site inspections once every six months during the defect liability period after construction completion

Expected benefitsExpected benefits

Expected benefits

Periodic inspections

  • prevent equipment breakdowns
  • extend equipment life
  • improve energy efficiency

Aftercare

  • minimises production interruptions
  • maintains stable product quality and cleanliness

Equipment inventoryEquipment inventory

Equipment inventory

Airflow, cleanliness and environment measurement

  • Anemometer 8386A/TSI
    Anemometer8386A/TSI

    Measurement / use
    Airflow and velocity measurement

  • Temperature recorder DX2020
    Temperature recorderDX2020

    Measurement / use
    Temperature recording

  • Airflow meter ALNOR6465
    Airflow meterALNOR6465

    Measurement / use
    Airflow measurement

  • Particle counter 237B
    Particle counter237B

    Measurement / use
    Airborne particle measurement

  • Digital thermo-hygrometer TESTO 635
    Digital thermo-hygrometerTESTO 635

    Measurement / use
    Temperature and humidity measurement

  • Sound level meter TESTO 815
    Sound level meterTESTO 815

    Measurement / use
    Noise measurement

  • Illuminance meter TESTO 545
    Illuminance meterTESTO 545

    Measurement / use
    Illuminance measurement

Electrical, flow and performance testing

  • Dielectric withstand tester ILO-PT2004
    Dielectric withstand testerILO-PT2004

    Measurement / use
    Dielectric withstand measurement

  • Electronic flowmeter KTM-800
    Electronic flowmeterKTM-800

    Measurement / use
    Pipe flow measurement

  • CLAMP METER HIOKI 3280-10
    CLAMP METERHIOKI 3280-10

    Measurement / use
    Current and voltage measurement

  • Heat-pump performance tester 50VP
    Heat-pump performance tester50VP

    Measurement / use
    Heat-pump and chiller performance testing

Precision dimension measurement

  • Pitch gauge
    Pitch gauge

    Measurement / use
    Thread pitch measurement

  • Vernier callipers 300mm
    Vernier callipers300mm

    Measurement / use
    Precision dimension measurement

Fabrication and welding

  • Copper pipe bender 15A-40A
    Copper pipe bender15A-40A

    Measurement / use
    PZPE bending

  • Electric welder 3KW
    Electric welder3KW

    Measurement / use
    General welding

  • Oxygen welderQuantity 3
    Oxygen welder

    Measurement / use
    General welding

View as table
Equipment → Measurement
NOEquipmentSpecificationQuantityMeasurement / use
1Pitch gauge-1Thread pitch measurement
2Vernier callipers300mm1Precision dimension measurement
3Anemometer8386A/TSI1Airflow and velocity measurement
4Dielectric withstand testerILO-PT20041Dielectric withstand measurement
5Electronic flowmeterKTM-8001Pipe flow measurement
6Temperature recorderDX20201Temperature recording
7Airflow meterALNOR64651Airflow measurement
8Particle counter237B1Airborne particle measurement
9Digital thermo-hygrometerTESTO 6351Temperature and humidity measurement
10Sound level meterTESTO 8151Noise measurement
11Illuminance meterTESTO 5451Illuminance measurement
12CLAMP METERHIOKI 3280-101Current and voltage measurement
13Heat-pump performance tester50VP1Heat-pump and chiller performance testing
14Copper pipe bender15A-40A1PZPE bending
15Electric welder3KW1General welding
16Oxygen welder-3General welding

Repair & ServiceReport a breakdown or request service

Repair and service

Send us the equipment name, site location and symptoms through the service form.

Service ContractsContracted customers and schedules

Service contracts

  • CustomerCompany A
    VisitsMonthly
    Scope
    • HVAC inspection and repair
    • AHU/HFU filter replacement and TAB
    • control system training
  • CustomerCompany B
    VisitsMonthlyTAB every 6 months
    Scope
    • AHU/chiller inspection
    • airflow measurement and pressure balancing
  • CustomerCompany C
    VisitsMonthly
    Scope
    • Cooling plant (towers, heat exchangers, pumps) inspection
  • CustomerCompany D
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
    • controls inspection
  • CustomerCompany E
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
    • controls inspection
  • CustomerCompany F
    VisitsEvery 2 months
    Scope
    • HVAC and refrigeration inspection
View as table
Service contracts
CustomerScopeVisits
Company AHVAC inspection and repair, AHU/HFU filter replacement and TAB, control system trainingMonthly
Company BAHU/chiller inspection, airflow measurement and pressure balancingMonthly; TAB every 6 months
Company CCooling plant (towers, heat exchangers, pumps) inspectionMonthly
Company DHVAC and refrigeration inspection, controls inspectionEvery 2 months
Company EHVAC and refrigeration inspection, controls inspectionEvery 2 months
Company FHVAC and refrigeration inspectionEvery 2 months

All contracted after the defect liability period ended

135 related projects (cumulative)

  • 한미정밀화학
  • 메디라인액티브코리아
  • 덴티움
  • 칼라콘아시아피시픽
  • 휴메딕스

Other business areas

Contact Us

Your next project starts here.

Talk to us about the right engineering approach for your facility, scale and schedule.